hrd hariadi

Sr QA/QC Inspector
  • kav Pancur Blok H no 24 Rt 02 Rw 01 Tanjung Piayu ,Sei Beduk-Batam
  • hrd_hariadi@yahoo.com
  • 081372415490
  • November 28, 1970

About Me

Dear Sirs,

Introduce me, I am a Plant Inspector, QA/QC Inspector or Welding Inspector CSWIP 3.1 and attendance CSWIP 3.2.1 ,
also completed NDT level II (MT,PT,RI,UT) by SNT-TC-1A.
My experience in the field of Piping or Structural or also pipe laying ( Pipe Line).

Thank you,

Regards,
Hariadi
QA/QC Inspector
Phone : +62 812 770 3670
Batam – Indonesia

Education

Senior High School

1990
A1

Pass

welding Diploma 4

2014
Indonesian National Framework Certificate Level VI (KKNI Jenjang Sertifikat VI) Welding Inspector

Pass

Work & Experience

Senior QA/QC Inspector

May 1, 2020
MC Dermott International Inc.

Project Involved:  Fabrication and assembly of 6 DSF for auxiliary and accommodation Aramco Marjan project.  Fabrication 3 units of the Jacket and 3 unit Jacket include deck WHP for Qatar Gas NFPS Project 1n1. Report to Mr. Andy Deepe

Senior QA/QC Inspector (Client Representative)

March 1, 2018 - December 31, 2019
PREMIER OIL Natuna Sea BV.

Project Involved:  Premier Oil Natuna Sea B.V BIGP Project – Fabrication and assembly 2 Cellar Deck Extension Framing for HPU Naga and Pelikan. And fabrication 2 units of the Chemical Injection for Naga and Pelikan. – Hook up installation 2 units of the Deck Extension and also install Chemical Injection. – Pipe line installation and umbilical cable installed at Natuna Sea.  SUBSEA – Fabrication PLEM Iguana, ILM Bison, PLEM Gajah Putri, SSIV AGX and TIE-IN Lembu & Macan Tutul, – Fabrication spool piping super duplex 12”, 10” and 8 “ for connection pipe line in PLEM and Platform Gajah Baru , Naga , Pelikan ,AGX and Anoa –  Pipe Line with TIMAS DLB 01 Barge TIM at Natuna Sea – Installation 16 KM pipe line from Pelikan WHP to subsea PLEM Iguana, ILM Bison. – Installation 40 KM Pipe Line from AGX Platform to PLEM Gajah Puteri.  Cutting Sling Wire using ROV with TIMAS DLB 01 Barge TIM at Natuna Sea – Mooring preparation for installation pipe laying o From Gajah Puteri Platform to AGX Platform (approximately 39.414 Km length). o From Iguana Subsea to Bison Subsea (approximately 8.143 Km length). o From Bison Subsea to Pelikan Platform (approximately 8.303 Km length). Report to Mr. Mr. Gulam Azis and Mr. Charles W. Rhoden.

Senior QA/QC Inspector (Client Representative)

October 1, 2015 - September 30, 2016
WARTSILA SHIP D - 5419 FITJAR, NORWAY

Project Involved:  Kraken FPSO North Sea type M70A and M70B – Fabrication and assembly Two Main Power Generator (Genset Module) Report to Mr. Kaisa Marton, Mr. Bert Wouters and Mr. Kevin Moden

Senior QA/QC Inspector

April 1, 2015 - June 30, 2015
EMAS AMC Pte Offshore Singapore

Project Involved:  Installation pipeline campaign Phase 3 Thailand E&P Limited at Gulf Thailand Report to Mr. Aswarman

Skills

QA/QC Inspector
84%
Welder ( SMAW, GTAW, FCAW GS atc)
90%
Construction Supervisor
50%

Be the first to review “hrd hariadi”

Your Rating for this listing

Related Candidates